Goldbar Lake Gold/VMS/Cu-Zn Potential Property
High grade boulder returned 91.2 to 189 g/t Au boulder
The Goldbar Lake Property consist of 54 mining cell claim units in the Tuuri / Walsh Twp. G-0635
Cell claims and boundary cell claim units included:
In the southern part of the Goldbar Lake property massive to semi massive sulphide below the second hydro line
up to 1 g/t Au and anomalies of Cu - Zn in surface samples. Northeast of the 91.2 to 189 g/t Au boulder
Shear structure drill site M55-22
Prospecting on the Goldbar Lake Property